10 kW solar system in Indore: cost with subsidy
The short answer
A 10 kW rooftop solar system in Indore costs about ₹5,80,000 installed and ₹5,02,000 after the ₹78,000 PM Surya Ghar subsidy. It generates roughly 1220 units a month — about ₹8,052 worth at Indore’s average tariff of ₹6.6/unit — and breaks even in around 5 years.
- net cost after subsidy
- ₹5,02,000
- net cost after subsidy
- generated per month
- 1220 units
- generated per month
- bill savings per month
- ₹8,052
- bill savings per month
- typical payback
- 5 yrs
- typical payback
The 10 kW breakdown for a Indore home
What it powers: effectively an entire villa or small commercial establishment — multiple ACs, heavy kitchen loads and pumps.
Roof you need: about 900–1000 sq ft of shadow-free space. Panels are mounted on a raised GI structure, so you keep usable terrace below.
Money over 25 years: beyond the 5-year break-even, the system keeps producing against tariffs that rise every year. Panels carry 25-year performance warranties; the inverter is the one mid-life replacement (around year 10–12).
Paperwork: your installer files for net metering with MPPMCL after you sign; the subsidy runs through the national portal and reaches your account after commissioning — the full process.
Get Indore installers to quote for this exact system
Up to three registered installers, real prices, free — and the numbers above stay visible so their quotes can be checked against them.
Request quotes in Indore10 kW in Indore: your questions answered
Is 10 kW the right size for my home in Indore?
10 kW generates about 1220 units a month in Indore, which suits households with bills around ₹5,636–₹8,857. If your bill is much lower, a smaller system is more honest economics; if much higher, size up — run the calculator for your exact bill.
How much roof area does 10 kW need in Indore?
Roughly 900–1000 sq ft of shadow-free roof (about 90 sq ft per kW plus row clearance), facing south, east or west with no water tank or parapet shadows.
What subsidy do I get on a 10 kW system in Indore?
₹78,000 under PM Surya Ghar (₹30,000/kW up to 2 kW, capped at ₹78,000 for 3 kW+). Credited to your bank account after MPPMCL inspects and commissions the system.
What appliances can a 10 kW system run in Indore?
effectively an entire villa or small commercial establishment — multiple ACs, heavy kitchen loads and pumps.
How long does installation take in Indore?
On-site work takes 1–3 days once the quote is signed. The full journey — MPPMCL feasibility approval, net meter installation and subsidy payout — typically runs 4–10 weeks.