1 kW solar panel price in Tura with subsidy
The short answer
A 1 kW rooftop solar system in Tura costs about ₹58,000 installed and ₹25,000 after the ₹33,000 PM Surya Ghar subsidy. It generates roughly 97 units a month — about ₹592 worth at Tura’s average tariff of ₹6.1/unit — and breaks even in around 4 years.
- net cost after subsidy
- ₹25,000
- net cost after subsidy
- generated per month
- 97 units
- generated per month
- bill savings per month
- ₹592
- bill savings per month
- typical payback
- 4 yrs
- typical payback
The 1 kW breakdown for a Tura home
What it powers: lights, fans, TV, fridge and small kitchen appliances — the essentials of a small home, without AC load.
Roof you need: about 90–100 sq ft of shadow-free space. Panels are mounted on a raised GI structure, so you keep usable terrace below.
Money over 25 years: beyond the 4-year break-even, the system keeps producing against tariffs that rise every year. Panels carry 25-year performance warranties; the inverter is the one mid-life replacement (around year 10–12).
Paperwork: your installer files for net metering with MePDCL after you sign; the subsidy runs through the national portal and reaches your account after commissioning — the full process.
Get Tura installers to quote for this exact system
Up to three registered installers, real prices, free — and the numbers above stay visible so their quotes can be checked against them.
Request quotes in TuraInstallers pay us per lead. You pay us nothing, ever.
1 kW in Tura: your questions answered
Is 1 kW the right size for my home in Tura?
1 kW generates about 97 units a month in Tura, which suits households with bills around ₹414–₹651. If your bill is much lower, a smaller system is more honest economics; if much higher, size up — run the calculator for your exact bill.
How much roof area does 1 kW need in Tura?
Roughly 90–100 sq ft of shadow-free roof (about 90 sq ft per kW plus row clearance), facing south, east or west with no water tank or parapet shadows.
What subsidy do I get on a 1 kW system in Tura?
₹33,000 under PM Surya Ghar (₹33,000/kW up to 2 kW, capped at ₹85,800 for 3 kW+). Credited to your bank account after MePDCL inspects and commissions the system.
What appliances can a 1 kW system run in Tura?
lights, fans, TV, fridge and small kitchen appliances — the essentials of a small home, without AC load.
How long does installation take in Tura?
On-site work takes 1–3 days once the quote is signed. The full journey — MePDCL feasibility approval, net meter installation and subsidy payout — typically runs 4–10 weeks.