5 kW solar system in Warangal: cost with subsidy
The short answer
A 5 kW rooftop solar system in Warangal costs about ₹2,90,000 installed and ₹2,12,000 after the ₹78,000 PM Surya Ghar subsidy. It generates roughly 610 units a month — about ₹4,758 worth at Warangal’s average tariff of ₹7.8/unit — and breaks even in around 4 years.
- net cost after subsidy
- ₹2,12,000
- net cost after subsidy
- generated per month
- 610 units
- generated per month
- bill savings per month
- ₹4,758
- bill savings per month
- typical payback
- 4 yrs
- typical payback
The 5 kW breakdown for a Warangal home
What it powers: two to three ACs, large appliances and a home-office setup simultaneously — the load of a large independent house.
Roof you need: about 450–500 sq ft of shadow-free space. Panels are mounted on a raised GI structure, so you keep usable terrace below.
Money over 25 years: beyond the 4-year break-even, the system keeps producing against tariffs that rise every year. Panels carry 25-year performance warranties; the inverter is the one mid-life replacement (around year 10–12).
Paperwork: your installer files for net metering with TGSPDCL / TGNPDCL after you sign; the subsidy runs through the national portal and reaches your account after commissioning — the full process.
Get Warangal installers to quote for this exact system
Up to three registered installers, real prices, free — and the numbers above stay visible so their quotes can be checked against them.
Request quotes in Warangal5 kW in Warangal: your questions answered
Is 5 kW the right size for my home in Warangal?
5 kW generates about 610 units a month in Warangal, which suits households with bills around ₹3,331–₹5,234. If your bill is much lower, a smaller system is more honest economics; if much higher, size up — run the calculator for your exact bill.
How much roof area does 5 kW need in Warangal?
Roughly 450–500 sq ft of shadow-free roof (about 90 sq ft per kW plus row clearance), facing south, east or west with no water tank or parapet shadows.
What subsidy do I get on a 5 kW system in Warangal?
₹78,000 under PM Surya Ghar (₹30,000/kW up to 2 kW, capped at ₹78,000 for 3 kW+). Credited to your bank account after TGSPDCL / TGNPDCL inspects and commissions the system.
What appliances can a 5 kW system run in Warangal?
two to three ACs, large appliances and a home-office setup simultaneously — the load of a large independent house.
How long does installation take in Warangal?
On-site work takes 1–3 days once the quote is signed. The full journey — TGSPDCL / TGNPDCL feasibility approval, net meter installation and subsidy payout — typically runs 4–10 weeks.